Customization: | Available |
---|---|
After-sales Service: | Remote Guided Maintenance |
Warranty: | 2 Years |
Still deciding? Get samples of US$ 200/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model
|
BST1100DC
|
BST1100/15DC
|
Rated Voltage (V)
|
DC24V above
|
DC24V above
|
Input power(W)
|
≤900W
|
≤900W
|
Speed (r/min)
|
≥1700
|
≥1700
|
Rated pressure (KPa)
|
700KPa
|
1500KPa
|
Max pressure(KPa)
|
800KPa
|
1600KPa
|
Restart pressure (KPa)
|
0KPa
|
0KPa
|
Rated volume flow (m3/h)
|
7.0m3/h @700KPa
|
1.8m3/h @1500KPa
|
Noise dB(A)
|
≤75dB(A)
|
≤75dB(A)
|
Ambient temperature ºC
|
-41~55ºC
|
-41~55 ºC
|
Insulation Class
|
F
|
F
|
Cold insulation resistance (MΩ)
|
≥100MΩ
|
≥100MΩ
|
Voltage resistance
|
1500V/50Hz 1min (No breakdown)
|
1500V/50Hz 1min (No breakdown)
|
Net weight (Kg)
|
16Kg
|
16Kg
|
Installation Dimensions (mm)
|
246×127 mm( Install foot M8)
|
246×127 mm( Install foot M8)
|
External Dimensions (mm)
|
319×195×290mm
|
319×195×290mm
|
serial number |
Code number | Name and specification | Quantity | Material | Note |
1 | 212010109 | Fan cover | 2 | Reinforced nylon 1010 | |
2 | 212010106 | Left fan | 1 | Reinforced nylon 1010 | |
3 | 212010101 | Left box | 1 | Die-cast aluminum alloy YL104 | |
4 | 212010301 | Connecting rod | 2 | Die-cast aluminum alloy YL104 | |
5 | 212010304 | Piston cup | 2 | PHB filled PTFE | |
6 | 212010302 | Clamp | 2 | Die-cast aluminum alloy YL102 | |
7 | 7050616 | Screw of cross head | 2 | Carbon structural steel of cold heading | M6•16 |
8 | 212010501 | Air cylinder | 2 | Thin wall pipe of aluninun alloy 6A02T4 | |
9 | 17103 | Seal ring of Cylinder | 2 | Silicone rubber | |
10 | 212010417 | Sealing ring of cylinder cover | 2 | Silicone rubber | |
11 | 212010401 | Cylinder head | 2 | Die-cast aluminum alloy YL102 | |
12 | 7020525 | Screw of inner hexagon Cylinder head | 12 | M5•25 | |
13 | 17113 | Sealing ring of connecting pipe | 4 | Silicong rubber | |
14 | 212010801 | Connecting pipe | 2 | Aluminum and aluminum alloy connecting rod LY12 | |
15 | 7100406 | Screw of Cross head | 4 | 1Cr13N19 | M4•6 |
16 | 212010409 | Limit block | 2 | Die-cast aluminum alloy YL102 | |
17 | 000402.2 | Air outlet valve | 2 | 7Cr27 quenching steel belt of The Swedish sandvik | |
18 | 212010403 | valve | 2 | Die-cast aluminum alloy YL102 | |
19 | 212010404 | Air inlet valve | 2 | 7Cr27 quenching steel belt of The Swedish sandvik | |
20 | 212010406 | Metal gasket | 2 | Stainless steel plate of heat and acidresistance | |
21 | 212010107 | Right fan | 1 | Reinforced nylon 1010 | |
22 | 212010201 | Crank | 2 | Gray castiron H20-40 | |
23 | 14040 | Bearing 6006-2Z | 2 | ||
24 | 70305 | Tighten screw of inner hexagon flat end | 2 | M8•8 | |
25 | 7020520 | Screw of inner hexagon Cylinder head | 2 | M5•20 | |
26 | 212010102 | Right box | 1 | Die-cast aluminum alloy YL104 | |
27 | 6P-4 | Lead protective ring | 1 | ||
28 | 70905152-211 | Hexagon head bolt | 2 | Carbon structural steel of cold heading | M5•152 |
29 | 71005120-211 | Screw of Cross head | 2 | Carbon structural steel of cold heading | M5•120 |
30 | 16602 | Light spring washer | 4 | ø5 | |
31 | 212010600 | Stator | 1 | ||
32 | 70305 | Lock nut of hexagon flange faces | 2 | ||
33 | 212010700 | Rotor | 1 | ||
34 | 14032 | Bearing 6203-2Z | 2 |
FAQ
Q1: Are you factory or trade company?
A1: We are factory.
Q2: What the exactly address of your factory?
A2: Our factory is located in Linbei industrial area No.30 Ruian City of Zhejiang Province, China
Q3: Warranty terms of your machine?
A3: Two years warranty for the machine and technical support according to your needs.
Q4: Will you provide some spare parts of the machines?
A4: Yes, of course.
Q5: How long will you take to arrange production?
A5: Generally, 1000 pcs can be delivered within 25 days
Q6: Can you accept OEM orders?
A6: Yes, with professional design team, OEM orders are highly welcome
Q7:Can you accept non-standard customization?
A7:We have the ability to develop new products and can customize, develop and research according to your requirements